Al-Madar Contracting W.L.L. was formed in 1992 under the umbrella of Al Madar Holding W.L.L., it has a registered and paid-up capital of 8 Million Qatar Riyals specialized in the field of design and construction of Civil and Industrial Construction as well as Infrastructure and Marine development works.
The company is ‘A’ Class certified and has also been certified by Bureau Veritas QHSE Assurance to the following Integrated Management System Standards (ISO 9001, ISO 14001 and OHSAS 18001).
The Company has executed projects for local Ministerial authorities such as M/s. ASHGHAL (Building Affairs & Drainage Affairs), Ministry of Interior, KAHRAMAA, Qatari Armed Forces, Woqod, QTEL, HMC, LUSAIL, QP/DOPET as well as many private sector projects.
Introduction About YIDA EXPRESS COMPANY This is Alex Long, sales manager from YIDA Express Elevator Co., Ltd who is specialized in production of elevators, escalators and passenger conveyors for over 20years. We YIDA Express Elevator factory locates in Nanxun city, Zhejiang province China (one hour driving to Shanghai city downtown). We YIDA were established in
Date Started: December 2, 2020 Read More
Specialize in Elevator & Escalator Manufacturing Focus on fulfillment to meet customer needs Factory cover an area of 0.11 km², Production Capacity ranking in the top group of China. Total investment: ¥460.08 million (USD66mm) There are more than 600 elevator manufacturing enterprises in China, among which we are ranked in top 20 in terms of
Date Started: November 11, 2020 Read More
The construction of Al Gharrafa Bus Station including Canopy, Substation building, Underground water tanks and External site development and road works. Client: ASHGHAL Consultant: AECOM Project Duration: 1.5 Years
Date Started: October 25, 2020 Read More
Design & Build Two Quarantine Veterinary and Laboratory at Hammad Port Messaid and Al Ruwais
Date Started: August 14, 2020 Read More
Construction of WOQOD Fuel Station at Lebsayyer: This project is located in Lebsayyer with plot area of 10,868 m2. Project includes construction of C-Store, Main Canopy, Fuel Tanks (6 Tanks), Mosque, Manual Car Wash, Vaccum & Lube Bay, Service Yard, Substation Commercial & Staff Accommodation Building and external landscaping works. Client: Woqod Project Duration: 1
Date Started: April 7, 2020 Read More
Construction of Qatar Media Studios & Admin Offices at Wadi Al Saail: The project is consisting of Studios and Administration building (G+1st Floor) and services building (G) at 37 TV: at Wadi Al Saail, Doha Qatar for QATAR MEDIA CORPORATION comprises of the construction 0f (G+1st Floor) for studios and administration building & (G) for
Date Started: April 7, 2020 Read More
Construction of WOQOD Fuel Station at Al Mearad: This project is located in Al Mearad with plot area of 15,380 m2. Project includes construction of C-Store, Main Canopy, Fuel Tanks (6 Tanks), Mosque, Manual Car Wash, Vaccum & Lube Bay, Service Yard, Substation Commercial & Staff Accommodation Building and external landscaping works. Client: Woqod Project
Date Started: April 7, 2020 Read More
Construction of 10 Separated Villas at Hazm Al Markhiya The proposed project is to be constructed in Hizam Al Markhia, Doha on a five (5) Separate Land Plots, Each Land Plot Area of Approx. 1,225.00 m2. The Construction Works of each plot consists of 10 Residential Villa + Their Auxiliary Buildings including Excavation, Backfilling, Foundation,
Date Started: July 10, 2019 Read More
Construction of Package 10 Al Sadd Heath Centre: This project is located in AL Sadd Doha, Qatar with plot area of 28,051 SQM. The project comprises Administration Offices, PCWIS (Primary Centre Walk-In Service), Walk-In Clinics, Imaging, Laboratory, and a Pharmacy on ground and first floors including basement accommodating Parking, Tanks, Services rooms etc.; and other
Date Started: July 6, 2019 Read More
Construction of WOQOD Fuel Station at Umm Garn: This project is located in Umm Garn Area with plot area of 9,598 SQM. Project includes construction of C-Store, Main Canopy, Fuel Tanks (6 Tanks), Mosque, Manual Car Wash, Vacuum & Lube Bay, Service Yard, Substation Commercial and Staff Accommodation Building and external landscaping works. Client: Woqod
Date Started: June 30, 2019 Read More
Road Improvement Works in Northern Areas Phase-3A: This project is located in Al Sakhama, Northern areas of Qatar. The project includes construction of temporary/permanent roads including Asphalt works, Kerb & Footways, Traffic Sign & Road marking, Surface water drainage, water works, electricity works & Ooredoo works. Client: Ashghal Project Duration: 1 Year
Date Started: June 20, 2019 Read More
2B+G+7 Residential Building: The proposed 2B+G+7 building is to be constructed on a 1,698.66 sq.m corner plot in Fareej Bin Mahmoud surrounded equally by roads and neighbors. The project is a reinforced concrete framed building with two basement floors as utilities and car parking facility. The ground floor will house the reception counter, indoor swimming
Date Started: June 10, 2019 Read More
Woqod Office tower with all complete finishing works, substation and electro-mechanical installation and landscaping.
Date Started: June 6, 2019 Read More
Al Mana Trading Co. to build Markaz Al Mana/Ford Showroom (2B+G+M+7F) in Najma, Airport Road. The Scope of Work consists of complete civil, structure, finishing and MEPD, as well soft and landscaping works.
Date Started: June 6, 2019 Read More
Project Description: Construction of Five Star Dunes Hotel in West Bay.
Date Started: June 6, 2019 Read More
Three Commercial Building at D-Ring Road
Date Started: June 5, 2019 Read More
Project Description: Construction of an apartment building with all complete finishing works, substation and electro-mechanical installation.
Date Started: April 6, 2019 Read More
Project Description: Construction of the hotel building with all complete finishing works, substation and electro-mechanical installation.
Date Started: April 6, 2019 Read More
QDB New Service Compound at New Industrial Area, Qatar
Date Started: April 6, 2019 Read More
Two Commerical Buiulding (B+G+1) at Al Hilal
Date Started: April 5, 2019 Read More
Safety and Sophisticated Entrance Door
Date Started: March 6, 2019 Read More
Iron Stairs with a Unique Design
Date Started: March 6, 2019 Read More
55 Villas Complex in Luqta Rayyan G+1
Date Started: March 6, 2019 Read More
Secondary School for Boys in West Bay
Date Started: March 6, 2019 Read More
Preparatory school exclusive for boys.
Date Started: March 6, 2019 Read More
210 Nos (G+1) Villas, Club House& Amenities in Al Waab
Date Started: March 6, 2019 Read More
Hospital and training center at Al-Khor
Date Started: March 6, 2019 Read More
Project Description: Construction of an office tower with all complete finishing works substation and electro-mechanical installation.
Date Started: March 6, 2019 Read More
Admin Office Building and Car Park for SCOJ at Industrial Area
Date Started: March 5, 2019 Read More
Refurbishment of AVM for Doha Bank at C-Ring Road
Date Started: March 5, 2019 Read More
Commercial Building (B+G+2) at Al Sadd
Date Started: March 5, 2019 Read More
Health Center and Laundry Block at MIC
Date Started: March 5, 2019 Read More
Commercial Building (G+5) at Mansoura
Date Started: March 5, 2019 Read More
Residential Building (B+G+4) at Muntazah
Date Started: March 5, 2019 Read More
QAFCO Office Building (B+G+4F) at Messaeed
Date Started: March 5, 2019 Read More
Juma Masjid & Sport Facilities at Dukhan
Date Started: March 5, 2019 Read More
All heavy equipment used in all of the company construction buildings.
Date Started: April 9, 2018 Read More
All the company construction project lifting machine equipment used.
Date Started: April 9, 2018 Read More
All construction project tower crane equipment used.
Date Started: April 9, 2018 Read More
Four Star Hotel elevator project (3B+G+14F) at Old Salata, Doha Qatar
Date Started: April 9, 2018 Read More
Hamad Medical Corporation Multi-Storey Car Park elevator project
Date Started: April 9, 2018 Read More
Dialysis Center of Hamad Elevator projects.
Date Started: April 9, 2018 Read More
Reception counter for Al Noor Tower at Westbay, Doha, Qatar
Date Started: April 9, 2018 Read More
Kitchen design project at Industrial Area, Doha, Qatar
Date Started: April 9, 2018 Read More
Office and Kitchen Project at Industrial Area, Doha, Qatar
Date Started: April 9, 2018 Read More